Vankor Northern field

The Vankor field is a perspective oil and gas field in Krasnoyarsk Krai of Russia; it is included to Vankor Cluster together with Lodochnoe, Tagulskoe and Suzunskoe fields.

Design period of filed operation is 35 years. Design capacity of the pipeline makes about 30 million tons per year, as of August 2009 the expected total proceeds from the project makes 80 billion USD.

In total 425 operational wells will be drilled, 307 of them are horizontal wells. Oil from the field is planned to be supplied to the Far East via ESPO pipeline. In the second half of 2009 the Vankor-Purpe pipeline which is 556 km long and 820 mm in diameter was put into test operation. This pipeline connected the field with Transneft main oil pipeline.

Specialists from the entire country, considerable part of them were from Bashkortostan, were involved to development, operation and maintenance of the field.

Photos

Return to Projects

Company products Services Production
Design
Our enterprise offers complex design of objects of fuel and energy complex, as well as objects of civil engineering. Our purpose is to provide...
Preparation of KMD drawings
Our company performs preparation of KMD drawings using up-to-date software Advance Steel in 3D format. This program is a customized application to AutoCad for...
Plasma and heat cutting and metal drilling
Ufa Oil and Gas Equipment Plant offers the following sheet and profile metal roll processing services. Use of high-tech equipment, high qualification of specialists...
Shot blasting
Short blasting technology is technology of processing of metal surfaces which is based on impact of fine spherical particles on metal. This method...
Anticorrosive treatment
Our enterprise performs anticorrosive treatment for different types of structures. The production plant is located in Ufa. We maintain partnership with the leading...
Heat insulation and electric wiring
Our enterprise performs heat insulation works using the most effective and best domestic and foreign heat insulation, fireproof materials and prefabricated structures. We also perform...
Preparation of KMD drawings
KMD drawings are prepared on the up-to-date software Advance Steel in 3D format. This program is a customized application to AutoCad for 3D construction...
Production process
The Production Department of the Ufa Metalworks is a shop of total area of 13 000 sq.m, where the equipment necessary for production of tanks, vessels...
Equipment
Metal structures are manufactured on Voortman (a well-known Dutch company) automatic line for production of metal parts and subproducts